AE Senior Thesis 2007
- Capstone Design Project E-Portfolio -
_________________________________________________________
Progress Log
| Date | Announcement |
| 5.8.07 | CPEP Page Finished and Posted for Review |
| 4.18.07 | Final Presentation |
| 4.16.07 | Finish Final Presentation, Practice |
| 4.12.07 | Finish Final Paper, and Submit for Grading |
| 4.10.07 | Finish Breadth Topics |
| 4.07.07 | Finish Mechanical Depth |
| 3.23.07 | Begin First Draft of Paper |
| 3.12.07 | Finish inputs for Energy Plus Model. Begin Troubleshooting |
| 3.09.07 | Complete initial Presentation Outline |
| 3.8.07 | Moisture Analysis and Research |
| 3.2.07 | Begin LEED EB Checks and Calculations |
| 2.19.07 | Site Visit and Existing Wall Conditions Calculations |
| 2.13.07 | Complete WUFI Modeling |
| 2.06.07 | Start Energy Plus energy modeling with Design Builder front end |
| 01.19.07 | Consultation with faculty advisor about final proposal changes |
| 01.19.07 | Proposal Addendum 1 Published |
| 12.18.06 | Building Statistics Part 2 Completed and Posted |
| 12.18.06 | Thesis Proposal Revised and Re-posted |
| 12.16.06 | Thesis Proposal Posted |
| 12.08.06 - 12.15.06 | Proposal Research and Considerations |
| 12.07.06 | Consultation with faculty advisor about proposal topics |
| 11.21.06 | Tech Report 3 Posted: Mechanical Systems | Existing Conditions Analysis |
| 11.01.06 | Tech Report 2 Posted, Final: Building and Plant Energy Analysis |
| 10.30.06 | Recieved Mechanical Cost Breakdown from Jerry at Whitby, Inc |
| 10.27.06 | Tech Report 2, 25% Submission Posted |
| 10.27.06 | Contact with Whitby, Inc. (Mechanical Contractor) |
| 10.16.06 | Contact with Carl Shilling, Burt Hill's Mechanical Engineer |
| 10.6.06 | Operations and Maintenance tour of Eberly Campus Community Center with Paul Mileko |
| 10.6.06 | Informational visit with Mucci Construction |
| 10.5.06 | Tech Assignment 1 Posted |
| 9.23.06 | Started Tech Assignment 1 |
| 9.22.06 | Student Bio Sketch Posted |
| 9.18.06 | Consultation with Bruce Rohrbach, Penn State Project Manager |
| 9.10.06 | Thesis webpage up and running |
| 9.5.06 | Consultation with faculty advisor about building selection and possibilities |
| 9.1.06 | Started 5th year course work |
Faculty Advisor: Dr. Jelena Srebric
Penn State Construction Managment contact: Bruce Rohrbach
Burt Hill contacts: Vince Fazzoni (Architect), Carl Shilling (Mechanical Engineer)
Mucci Construction contact: Kirsten Mucci
Penn State Fayette Campus contacts: Paula Congelio, Paul Mileko
Whitby, Inc. contact: Jerry (Mechanical Contractor)