Kevin Clouser
Structures
The Harry and Jeanette Weinberg Center
at Mercy Hospital
Baltimore, Maryland

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Kevin's AE Senior Thesis e-Portfolio

Progress Log

Date Announcement
4.31.07 ABET Survey and Thesis Reflection Posted
4.12.07 Final Report posted to website
3.9.2007 Presentation Outline posted to Website
2.16.2007 Post Tensioning question posted to Discussion Board
2.2.2007 Meet with Dr. Schneider to discuss post-tensioning floor systems
1.29.07 Thesis Proposal Revised and Posted
1.25.07 Meet with faculty consultant to discuss Proposal Revision
12.15.06 Building Statistics and Thesis Proposal Posted
12.4.06 Building Abstract Finished and Posted
11.21.06 Technical Assignment 3 Posted
10.27.06 Technical Assignment 2 Posted
10.5.06 Technical Assignment 1 Posted
9.20.06 Building Statistics Posted
9.18.06 Building Statistics 1 Resubmitted
Main CPEP webpage up and running
9.8.06 Building Statistics 1 Submitted

 

Senior Thesis | Architectural Engineering | AE Lab | |
This Page was last updated on May 1, 2007 , By Student Name and is hosted by the AE Department ©2005