Welcome to Michelle's AE Senior Thesis e-Portfolio
Progress Log
Date | Announcement |
4.16.07 | Thesis presentation |
4.12.07 | Final Report submitted and posted |
3.21.07 | Meeting with Dr. Schneider to discuss foundation design |
3.9.07 | Posted Proposed Presentation Outline |
3.5.07 | Meeting With Dr. Memari to discuss moment connections and load distribution |
1.31.07 | Meeting with Dr. Lepage to discuss skip-joists |
1.18.07 | Updated Proposal posted |
12.15.06 | Buildnig Statistics part 2 and Proposal posted |
12.6.06 | Meeting with advisor to discuss proposal options |
12.2.06 | Began work on proposal |
11.20.06 | Posted Technical Assignment 3 |
10.26.06 | Posted Technical Assignment 2 |
10.20.06 |
Posted Bio |
10.10.06 | Posted Abstract |
10.5.06 | Posted Technical Assignment 1 |
9.17.06 | Building Statistics part 1 posted |
9.12.06 | Started working on CPEP site |
9.5.06 | Classes started |
8.11.06 | Owner permission slip faxed |
7.13.06 | Picked building |