Thomas Sabolhhh

Structural

Hilton Hotel at BWI Airport

Linthicum Heights, MD

 

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio

 

Progress Log

 

Date Announcement
8.1.06 Met with Mr. David Holbert of Holbert Apple Associates to receive Thesis building construction documents and to discuss the structural design of the building.
9.5.06 Phone conversation with Scott Stevenson of HITT Contracting to discuss construction methods and schedule as well as other project related information.
9.14.06 Contacted William Sabol, PhD, of GAO to discuss research methods for a LEED related breadth topic.
10.25.06 Met with Prof. Parfitt to discuss the design of the Girder-Slab floor system.
11.9.06 Met with Prof. Parfitt to discuss the analysis of my building's lateral resistance system. Hand calc's of the system will be done by simplifying the building
12.8.06 Met with Prof. Parfitt to discuss proposal ideas
12.13.06 Discussed proposal ideas with Dr. Memari
1.22.07 Discussion with Mr. Daniel Fisher about the Girder-Slab system.

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Thomas Sabol |
This Page was last updated on May 6, 2007 , By Thomas Sabol and is hosted by the AE Department ©2005