Progress Log
Date | Announcement |
8.1.06 | Met with Mr. David Holbert of Holbert Apple Associates to receive Thesis building construction documents and to discuss the structural design of the building. |
9.5.06 | Phone conversation with Scott Stevenson of HITT Contracting to discuss construction methods and schedule as well as other project related information. |
9.14.06 | Contacted William Sabol, PhD, of GAO to discuss research methods for a LEED related breadth topic. |
10.25.06 | Met with Prof. Parfitt to discuss the design of the Girder-Slab floor system. |
11.9.06 | Met with Prof. Parfitt to discuss the analysis of my building's lateral resistance system. Hand calc's of the system will be done by simplifying the building |
12.8.06 | Met with Prof. Parfitt to discuss proposal ideas |
12.13.06 | Discussed proposal ideas with Dr. Memari |
1.22.07 | Discussion with Mr. Daniel Fisher about the Girder-Slab system. |