Boston University Arena and Recreation Center
Boston, MA  

 

Alexis M. Kreft
Lighting/Electrical Emphasis

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Alexis's AE Senior Thesis e-Portfolio

Technical Assignments

Technical Report1 is an analysis of the existing lighting system design. Included with the report are design criterion and calculation studies for four different spaces. Please review the executive summary for a brief description of the report.

Executive Summary

Technical Assignment 1

Technical Report 2 is an analysis of the existing electrical system within the Recreational Center. Included in the report are detailed descriptions of the electrical components, a single-line diagram, and a brief description of the communication systems.

Executive Summary

Technical Assignment 2

Technical Report 3 is a schematic design proposal for the four spaces I chose to focus my area of study. The report includes a general building overview as well as design goals, concepts, and sketches for each individual space. After presenting the proposal to industry members at Lutron, I have posted their comments and/or questions.

Technical Assignment 3

Comments from Lutron

Mid-Semester Thesis Report

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on February 22, 2007 , By Alexis Kreft and is hosted by the AE Department ©2005