Welcome to Cynthia Milinichik's AE Senior Thesis e-Portfolio
Technical Assignments
Executive Summary
A detailed description and a preliminary analysis of the existing structural system of the 57 story Comcast Center located in Philadelphia, PA is presented in this report.
Technical Report 1
______________________________________________________________________________________
Executive Summary
A preliminary analysis of alternative floor systems.
Technical Assignment 2
______________________________________________________________________________________
Executive Summary
This assignment confirms the existing lateral system design of the Comcast Center.
Technical Assignment 3
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of Cynthia Milinichik. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.