Devin Learn

Construction Management
Lancaster General Hospital 5th & 6th Fl. Fit-out / Cardiac Elevator
Lancaster, Pennsylvania

Title Block

 

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Devin Learn's AE Senior Thesis e-Portfolio

Progress Log

Date Announcement
5.1.07 CPEP Complete/Ready for Final Review
4.28.07 Posted Presentation
4.18.07 Thesis Presentation
4.10.07 Posted Final Report
4.9.07 Finished Final Report
3.9.07 Posted Presentation Outline Draft
2.26.07 Scheduled Meeting with Dr. Messner
2.25.07 Posted ICRA-MEP to Discussion Board
2.25.07 Posted Research Survey
1.31.07 Posted Revised Proposal
12.8.06 Posted Proposal
12.7.06 Posted Technical Assignment 3
11.29.06 Posted Proposal Presentation
10.30.06 Posted Techincal Assignment 2
10.18.06 Site Visit to Lancaster General Hospital
10.5.06 Posted Abstract
10.5.06 Posted Existing Construction Conditions
10.5.06 Posted Technical Assignment 1
9.20.06 Posted Building Statistics and Personal Bio
9.11.06 Posted Main CPEP page
9.5.06 Started 5th year course work

Enter Information Flow and Communications with design professionals.

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Devin Learn |
This Page was last updated on May 1, 2007 , By Devin Learn and is hosted by the AE Department ©2005
May 1, 2007May 1, 2007May 1, 2007May 1, 2007