Devin Learn

Construction Management
Lancaster General Hospital 5th & 6th Fl. Fit-out / Cardiac Elevator
Lancaster, Pennsylvania

Title Block

 

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Devin Learn's AE Senior Thesis e-Portfolio

Final Report

The following report is a culmination of the past year's research and analysis of Devin Learn's Building.

Complete Final Report (PDF)

Executive Summary

Acknowledgments

Project Introduction

Project Background

Depth Research: Commissioning Vs. Retro-Commissioning

Breadth Structural Analysis: Cast-In-Place Vs. Pre-Cast Floor System

Breadth Mechanical Analysis: Mechanical Connections at ICRA Partitions

Summary and Conclusions

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Devin Learn |
This Page was last updated on April 28, 2007 , By Devin Learn and is hosted by the AE Department ©2005
April 28, 2007April 28, 2007April 28, 2007April 28, 2007April 28, 2007April 28, 2007