Erik R. Shearer

Mechanical
The Mount St. Mary's - Student Housing Project
Emmitsburg, MD 21747

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to STUDENT's AE Senior Thesis e-Portfolio

Progress Log

 

Date Announcement
5.3.07 CPEP finalized.
5.2.07 Presentation posted.
4.11.07 Final Report turned in and posted.
2.23.07 Progress log was updated.
2.18.07 Thesis Proposal was resubmitted.
2.12.07 Conversation with mechanical engineer about schedules and design parameters for heating and cooling system.
2.6.07 Question was posted on discussion board.
12.24.06 Thesis proposal approved by advisor.
12.14.06 Thesis Proposal was posted.
12.10.06 Building Statistics Part 2 was posted.
11.21.06 Technical Assignment #3 was posted.
11.15.06 Conversation with mechanical engineer in reference to design requirements and objectives.
11.10.06 Conversation with advisor for feedback on Technical Assignments 1 & 2 and to discuss Technical Assignment #3.
10.27.06 Technical Assignment #2 was posted.
10.24.06 Conversation with mechanical engineer in reference to geothermal heat pumps and HAP claculations.
10.7.06 Bio and resume were posted.
10.5.06
Technical Assignment #1 was posted.
10.5.06 Thesis Abstract was posted.
10.3.06 Conversation with mechanical engineer in reference to energy recovery units and operable windows.
9.22.06 Building Statistics Part 1 was posted.

Enter Information Flow and Communications with design professionals.

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on May 4, 2007 , By Student Name and is hosted by the AE Department ©2005