Project Overview
- 34 Million dollars
- 180,000 SF Class-A Office Space
- 130,000 SF Underground Parking
- Ground Floor Retail Spaces
Architectural Features
- Featured Glass Tower
- Pre-Cast Concrete Façade with textured rock-face detail
- Natural stone and Terrazzo-floored lobby
Structural System
- Cast-in-Place Concrete
- Concrete slabs and frame
- Post-tensioned slabs above ground floor
- Cast-in-place concrete spread footings
Mechanical System
- 12 Factory-built Air Handling Units
- Electric heating coils
- Central chilled water plant
- Digitally-controlled multiple zones with VAV boxes
Electrical System:
- 277/480V, 3-Phase, 4-Wire, 8000A utility service junction box
- Two 3000A main switchboards
- 1200A bus gutter for retail service
- 5,840 kVA total connected load
- Diesel engine emergency generator