The links below will connect you to the three Technical Assignments completed throughout the fall semester. Each of the Technical Assignments provided a chance to explore the existing structural system. This valuable knowledge will be referenced and used throughout the course of research to be conducted in Spring 2006.

Technical Assignment 1 is a preliminary analysis and description of the existing structural system of Eight Tower Bridge.

Technical Assignment 1 Executive Summary

Technical Assignment 1 (submission 10-5-2005)

Technical Assignment 1 (submission 11-7-2005)

Technical Assignment 2 is the study and design of five alternative flooring systems that could be used in Eight Tower Bridge.

Techincal Assignment 2 Executive Summary

Technical Assignment 2

Technical Assignment 3 is an in-depth investigation of the lateral system of Eight Tower Bridge.

Technical Assignment 3 Executive Summary

Technical Assignment 3

 