TECHNICAL ASSIGNMENTS
Technical Assignment 1 - October 5, 2005
This report is an analysis of the existing structural conditions, including lateral loads and floor spot checks. An in-depth description of the structural system is included. Also included in the report are seismic and wind analyses as well as a check of a typical shear wall.
Executive Summary Full Report
Technical Assignment 2 - October 31, 2005
This report is a structural study of alternate floor systems. The report includes analysis and comparisons for four different alternate floor systems. It also summarizes the pros and cons of each system to determine their viability for further investigation.
Executive Summary Full Report
Technical Assignment 3 - November 21, 2005
This report is an analysis of the existing lateral force resisting system. Included in the report is a determination of wind and seismic forces in order to determine the design control. Also included is the method for distribution of these forces to determine if the existing structure meets strength and drift requirements.
Executive Summary Full Report