Welcome to Greg Kemerer's AE Senior Thesis e-Portfolio
Progress Log
Date |
Announcement |
4.14.06 |
Posted Presentation Materials |
4.3.06 |
Posted Final Report |
3.28.06 |
Completed Analysis 3 |
3.18.06 |
Completed Analysis 2 |
2.22.06 |
Completed Analysis 1 |
1.30.06 |
Updated Thesis Proposal |
12.12.05 |
Posted Thesis Proposal |
11.21.05 |
Posted Technical Assignment 3 |
10.31.05 |
Posted Technical Assignment 2 |
10.4.05 |
Posted Technical Assignment 1 |
10.3.05 |
Posted Thesis Abstract |
9.18.05 |
Posted Bio Sketch |
9.15.05 |
Posted Building Statistics |
8.30.05 |
Started 5th year course work |
Enter Information Flow and Communications with design professionals.
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of $!!STUDENT!!$. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.