Technical Assignments
Proposal
PROPOSAL.PDF
Technical Assignment 1
This focus of this report is to introduce and analyze the existing conditions
for the structural system of the Christina Landing Apartment Tower.
EXECUTIVE SUMMARY
TECH 1.PDF
Technical Assignment 2
The focus of this report is to show various alternate floor systems and
comment on their potential for redesign.
EXECUTIVE SUMMARY
TECH 2.PDF
Technical Assignment 3
This report contains a more in-depth analysis of the lateral resisting
system, story forces, drift and strength calculations.
EXECUTIVE SUMMARY
TECH 3.PDF
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of Gregory Eckel. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.