Final Report
Table Of Contents
Building Introduction
Executive Summary
Paper Objective
1.1 Original Design Critique
1.2 Proposal 1 Critique
1.3 Proposal 2 Critique
2 Modeling Strategy
3.1 Original Design Calculation Results
3.2 Proposal 1 Calculation Results
3.3 Proposal 2 Calculation Results
3.4 Base Case Calculation Results
4 Comparison and Conclusions
Acknowledgments and Thanks
A Addendum 1-6
C Calculations 1-7
E Equipment 1-4
Building Abstract