Technical Assignment 1: ASHRAE STD. 62-2004 Ventilation Compliance
Analysis
Technical Assignment #1 Full Report
Technical Assignment one was an investigation into the compliance of the
Bloomberg Tower with ASHRAE Standard 62.1-2004. A discussion and comparison
of both the ventilation rate procedure and the indoor air quality procedure,
as described by this standard, is also included in the report.
Technical Assignment 2: Building Plant and Energy Performance
Executive
Summary
Technical Assignment #2
Full Report
Description.
Technical Assignment 3 Existing Conditions Report
Description.
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of $!!STUDENT!!$. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.