Welcome to David J. Anderson's AE Senior Thesis e-Portfolio
Thesis Abstract
Thesis Abstract
Click here for a full, color version in PDF format
Executive Summary
- Clemson University Advanced Material Research Laboratory is located in South Carolina. This two-story building houses offices, labs, and cleanrooms. The $18.5 million building is 111,270 sq ft. and was completed in July of 2004. The Architects and Engineers responsible for this building is IDC Architects. For further information on the project team, architecture, the mechanical systems, structural systems, and electrical & lighting systems, please see the thesis abstract.
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of David J. Anderson. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.