12.4.06 Began preliminary column layout for switching the building from masonry bearing wall to steel frame, researched staggered truss lateral systems and partially reinforced composite connections, and arranged for an engineer at Baker, Ingram & Associates to review the current proposed column layout.
11.22.06 Met with Dave Rosso, PE, and Ryan Gee, EIT, of Baker, Ingram & Associates to discuss existing lateral systems and shearwall design
10.20.06 Met with Dr. Lepage to discuss Technical Report 1
10.06.06 Met with Ryan Gee, EIT,of Baker, Ingram & Associates to discuss possible alternate floor and lateral systems
9.22.06 Met with Dr. Lepage to discuss semester plans for thesis research
9.5.06 Started 5th year course work

 