TRAVIS ANDERSON SMITH

CONSTRUCTION MANAGEMENT
DOLPHIN MALL EXPANSION
MIAMI, FLORIDA

building1

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

WELCOME TO TRAVIS ANDERSON SMITH'S AE SENIOR THESIS E-PORTFOLIO

PROGRESS LOG

DATE ANNOUNCEMENT
APRIL 12 THESIS FINAL REPORT
APRIL 10 FINAL DAY OF POWER POINT WRITTING (PRESENT ON 17)
FEB 16 SCHEDULED DR. RILEY MEETING
MARCH 30 FINAL DAY OF SCHEDULE REDUCTION
MARCH 16 FINAL DAY OF CONSTRUCTIBILITY
MARCH 9 FINAL DAY OF VALUE ENGINEERING
MARCH 30 FINAL DAY OF SPRINKLER ANALYSIS
MARCH 2 FINAL DAY OF STRUCTURAL ANALYSIS (IN PROGRESS)
MARCH 9 FINAL DAY OF SURVEY COMPILATION (IN PROGRESS)
FEB 28 FINAL DAY OF SURVEY RETURNS (IN PROGRESS)
JAN 31 FINALIZE SURVEY (COMPLETE)

 

SENIOR THESIS | THE PENNSYLVANIA STATE UNIVERSITY | ARCHITECTURAL ENGINEERING | AE LAB | CONTACT TRAVIS ANDERSON SMITH |
THIS PAGE WAS LAST UPDATED ON April 10, 2007 , BY TRAVIS ANDERSON SMITH AND IS HOSTED BY THE AE DEPARTMENT ©2006