Final Report
Table of Contents
Abstract
Acknowledgements
Executive Summary
Project Design Overview
Primary Engineering Systems
Project Cost Evaluation
Project Summary Schedule
Project Team Overview
Client Information
Project Delivery System
Existing Conditions Report
Vicinity Maps
Local Conditions
Existing Conditions Site Plan
Project Logistics Details
Detailed Project Schedule
General Conditions Estimate
Depth Topic - Infection Control Risk Assessment
Problem / Goals / Research Techniques
Background
Implications of ICRA
ICRA Analysis
Suggested Actions
Additional ICRA Provisions Unique to Civista
ICRA - 2nd Floor East Wing Sequencing
Conclusion
Technical Analysis 1 – Steam Turbine vs. Pressure Reducing Valve
Problem / Goals / Research Techniques
Background
Redesign Steam PRV to Non-condensing Backpressure Steam Turbine
Cost Analysis
Conclusion
Technical Analysis 2 – Aluminum vs. Copper Conductors
Problem / Goals / Research Techniques
Background
NEC / ASTM / UL / NFPA
Physical Properties
Special Installation Requirements
Feeder Schedule
Copper Wiring and Conduit Costs
Size Aluminum Wiring and Conduit
Time Saved
Cost Comparison
Conclusion
Appendix
Appendix A - Project Summary Schedule
Appendix B - Existing Conditions Site Plan
Appendix C - Detailed Project Schedule
Appendix D - General Conditions Estimate
Appendix E - ICRA Sequencing