Justin Purcell | STRUCTURAL: ADMINISTRATION BUILDING, PA | |||||||||||||||
|
|||||||||||||||
|
A proposal addresses a particular problem, and the proposed method of solution of the problem It provides the information given in the body of the document, without requiring the reader to leaf through the full document. The executive summary is an overview of the actual document. Breadth 1: CM Changing from a composite system to an open web joist system will impact the cost and schedule. An in-depth cost and schedule impacts of open web joists will be analyzed for my construction management breadth. This includes a further analysis of just R.S. Means, but an assemblies estimate. Sub contractor input and vendor quotes will be analyzed.
Breadth 2: Electrical For the electrical breadth study, a redesign of the transformers for the buildings electrical power distribution system. Currently there are an excessive amount of transformers used in the electrical power distribution. To reduce the number of transformers, the feeders must also be resized. |
||||||||||||||
|