Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
|
|
Final Presentation:
This powerpoint presentation was presented to the Architectural Engineering faculty on April 15, 2008. It was created to summarize the final report and includes general information about the project, a description of the existing structural system, the proposed concrete redesign, and the construction management comparison. The acoustical analysis was not included due to time constraints.
To view the Final Report in Microsoft Powerpoint, CLICK HERE.
To view the Final Report in PDF format, CLICK HERE.
|
|
|
|