Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Megan Kohut. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
Presentation
This presentation was presented to AE faculty and students on Tuesday April 15, 2008. It sums up all the work I completed over the previous eight months. The presentation includes a description of the existing structural system and my proposed redesign which includes a civil/site and architectural design, structural design, and a project cost and schedule. Both the PowerPoint file and a PDF version are provided for your convenience.