|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
User Note:
Note:
While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Nicholas Kutchi. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
|
|
Thesis Presentation
The following link is a PowerPoint presetnation that was presented April 16th, 2008. The presentation took 11.5 minutes and was presetnted in front of a jury of Lighting | Electrical Professors, other AE option professors, and a general audience of students and the public.
Final Thesis PowerPoint Presentation (18kb)
Cafe and Courtyard Walkthrough (75kb)
|