user note: while great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of tom yost. changes and discrepancies in no way imply that the original design contained errors or was flawed. differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
|
|
![](images/mm_spacer.gif)
final report (6 may 2008)
revised final report (63.6MB)
final report (no appendicies)
appendicies
final report (10 april 2008)
final report (61.57MB)
![](Final Report/Final Report Icon 2.jpg)
final report - by sections
abstract (7.46MB)
executive summary (127KB)
introduction (175KB)
existing conditions (312KB)
proposal (136KB)
depth study (1.60MB)
breadth studies (316KB)
conclusion & acknowledgements (126KB)
appendices (39.45MB)
|
|
|
|