![]() |
North Pocono High School |
||||||||||||||||
Dan HanleyMechanical Option
North Pocono High School |
|||||||||||||||||
![]() |
|||||||||||||||||
![]() |
|||||||||||||||||
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the infromation contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction mehtodologies for this senior thesis project are solely the interepretation of Dan Hanley. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
![]() |
The final report with the analysis and results of the redesign of North Pocono's HVAC system is posted below. |
![]() |
||||||||||||||
Thesis | Penn State Home Page | Penn State AE Website | Computer Labs | Contact |
This Page was last updated on 04/23/2009, by Dan Hanley and is hosted by the AE Department @2008 |