Worcester, MA
Stuent CPEP site is complete and ready for review.
Final Presentation posted to CPEP site.
Technical Report 1: The following Technical Report is intended to discuss preliminary stages of construction of the Worcester North High School. Focusing on Construction Management aspects of the project, studies include cost estimations, scheduling, contracting, organizational structure and existing conditions.
Techincal Report 2: Technical Report II of the Worcester North High School project covers important aspects of project execution.
Herein are analyses of scheduling, site layout, estimating and industry issues.
Technical Report 3: The final Technical Report III discusses issues surrounding and possible improvements to the Worcester North High School Project. Specifically, the sections Constructability Challenges, Caveats of Scheduling and Value Engineering pertain to information obtained during a November 2009 visit to the Worcester construction site. The Problem Identification and Technical Analysis Methods sections address proposals to investigate sustainability, logistics and construction processes on the project.