Lighting/Electrical
2010/2011
"Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are soley the interpretation of Christopher Russell. Changes and discrepencies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design"
This proposal is contains BIMception's plan and goals for the spring semester, including facade redesign, plenum investigation, cantilever structure investigation, and cantilever plaza lighting design.
This proposal reduces structural scope, incudes the addition of electrical requirements, additional daylight/lighting control of perimeter spaces, a crane analysis for the construction management plenum coordination and adjusted constructural management based on other dicipline changes.