Butler Memorial Hospital

New Inpatient Tower
Butler, PA

Matthew S. Geary
Mechanical Option

Home
Student Bio
Building Statistics
Abstract
Research
Proposal
Presentation
Final Report
Reflection
Thesis e-Studio
 
Final Report
 
Final Report

This report is an analysis of the Butler Memorial Hopsital's New Inpatient Tower with a focus on the mechanical systems. Contained within, are details regarding the original design, as well as a propsed redesign which should enable energy and cost savings.

Executive Summary

 

 
 

 

 

 

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Matt Geary. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

Senior Thesis Home

msg5039@psu.edu
This page was last updated on 04/07/2011 by Matthew Geary and is hosted by the AE Department ©2010