This report is a complinace analysis of the Butler Memorial Hopsital's New Inpatient Tower with ASHRAE Standards 62.1 and 90.1. Research was conducted, data reported, and calculations performed to check compliance.

Technical Assignment 2

This report is a thermal load and energy analysis of the Butler Memorial Hospital's New Inpatient Tower. Located within are load calculations and economic costs of operating the hospital.

Trane Trace 700H was utilized to do the energy model.

Technical Assignment 3

This report is the third and final technical report focusing primarily on the mechanical systems within the New Inpatient Tower.

Enclosed is a mechanical system summary, a thermal load analysis, building energy analysis, and overall evaluation of the mechanical systems design.

 

 

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Matt Geary. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

Senior Thesis Home

msg5039@psu.edu
This page was last updated on 12/01/2010 by Matthew Geary and is hosted by the AE Department ©2010