Throughout the 2013/2014 school year multiple technical assignments and analyses have been produced on
this library in metropolitan Washington, D.C. Past Technical Assignments can be found on this CPEP
website. With the help of the project team, industry members, and professors this year long capstone project
included four analysis (found in this report), one of which acted as a research topic. These analyses were for
educational purposes only and are not direct comparisons to accrual scenarios encountered. |
|
Executive Summary |
|
To view and/or download a PDF of the Executive Summary click the Executive Summary picture above. |
|
|
|
User Note: While great efforts have been taken to provide accurate and complete information on the
pages of CPEP, please be aware that the information contained herewith is considered a work in in progress
for this thesis project. Modifications and changes related to the original building designs and
construction methodologies for this senior thesis project are solely the interpretation of Lowell Stine. Changes and discrepancies in no way imply that the original design contained errors or was
flawed. Differing assumptions, code references, requirements, and methodologies have been
incorporated into this thesis project; therefore, investigation results may vary from the original
design. |
|
|