Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Anderson Clemenceau. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
Final Report This Final Report is the culmination of an entire academic year's worth of investigation into the mechanical systems of the Ed Roberts Campus. This objective of this report was to investigate the potential energy savings to be acheived with the proposed mechanical system renovations, as well as their impact on other building systems. An in depth investigation and energy model of the existing building conditions was conducted. The proposed systems, a Variable Refrigerant Flow HVAC System and a Solar Thermal Hot Water System, were designed and energy models were performed to evaluate their performance and economic viability. The conclusions of this report can be found in the full report or executive summary, posted below.
|
News Feed 4/22/2015 - CPEP Completed 4/22/2015 - CPEP Reflection Posted 4/22/2015 - ABET Assessment Posted 4/21/2015 - Final Presentation Posted 4/21/2015 - Final Report Posted 3/30/2015 - Presentation Outline Posted 1/19/2015 - Proposal Updated and Posted 12/12/2014 - Proposal Posted 11/11/2014 - Tech Report 3 Posted 10/21/2014 - Building Statistics 2 Posted 10/20/2014 - Abstract Posted 10/06/2014 - Tech Report 2 Posted 10/06/2014 - Tech Report 1 Posted 09/16/2014 - Building Statistics 1 Posted 09/15/2014 - CPEP Full Functionality 09/08/2014 - CPEP Home Page Draft 09/02/2014 - CPEP Seminar 09/01/2014 - Project Initiation Forms 08/26/2014 - Personal Thank You Sent 08/25/2014 - Documents Received 07/24/2014 - Owner Permission Obtained |
---|
Last updated on 4/22/2015 by Anderson Clemenceau and is hosted by the AE Department 2014 |