    TECHNICAL REPORT I

    This report outlines and discusses the existing conditions of the four spaces to be studied within the Denver Police Department Crime Lab. Focusing on lighting, the report further elaborates on design criteria and code for each space.

    Main DNA Lab AGI

    Multipurpose Room AGI

    October 17, 2014

    TECHNICAL REPORT II

    This report discusses the designed electrical systems, going into great detail about the equipment that powers the building. Furthermore, it suggests potential improvements to the Denver Crime Lab.

    Appendices

    November 14, 2014

    TECHNICAL REPORT III

    In this presentation the concept and lighting schematics for the crime lab are analyzed.

Navigation Menu
  • home
  • about me
  • building statistics
  • abstract
  • technical reports
  • proposal
  • presentation
  • final report
  • reflection
  • e-studio
user note
  • Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐ progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Jackie Eury. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
Studio Hours
  • All day, erryday
  • This page was last updated on 29 April, 2015 by Jackie Eury and is hosted by the AE Department © 2014.
other useful links
  • The Pennsylvania State University
  • Architectural Engineering
  • AE Computer Labs