Kristen Eash

Construction Management
The Research and Economic Developement Center
Erie, Pa

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Kristen Eash's AE Senior Thesis e-Portfolio

Technical Assignments

Proposal

Description.

Technical Assignment 1

This technical assignment discuses the owner, users, and construction team. It also delves into the construction methods, schedule and cost of the building. Pictures and site plans are used ot illistrate the dialoge and allow easier understanding.

Executive Summary

Technical Assignment 1

Technical Assignment 2

This technical assignment goes in depth into the schedule and costs of the project. Approximately, a 180 activity schedule was devised, a site layout plan for the steel errection phase, an assemblies estimate for the cladding system, a detailed estimate for the structural system, and the general conditions for the CM Agency were performed for this excersize.

Executive Summary

Technical Assignment 1

Site Layout

Technical Assignment 3

Technical Assignment # deals with investigating issues that affect the project. Industry issues that were posed during the PACE Roundtable are listed, as well as construction and design issues with the building itself. In this assigment these issues were narrowed down to the main research and analysis points that will be used for the Thesis Proposal and reaminter of the thesis expierence

Executive Summary

Technical Assignment 3

Executive Summary - Industry Issues

Industry Issues

 

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Kristen |
This Page was last updated on December 12, 2005 , By Student Name and is hosted by the AE Department ©2005