AE Senior Thesis 2007
- Capstone Design Project E-Portfolio -
_________________________________________________________
Progress Log
Date | Announcement |
5.8.07 | CPEP Page Finished and Posted for Review |
4.18.07 | Final Presentation |
4.16.07 | Finish Final Presentation, Practice |
4.12.07 | Finish Final Paper, and Submit for Grading |
4.10.07 | Finish Breadth Topics |
4.07.07 | Finish Mechanical Depth |
3.23.07 | Begin First Draft of Paper |
3.12.07 | Finish inputs for Energy Plus Model. Begin Troubleshooting |
3.09.07 | Complete initial Presentation Outline |
3.8.07 | Moisture Analysis and Research |
3.2.07 | Begin LEED EB Checks and Calculations |
2.19.07 | Site Visit and Existing Wall Conditions Calculations |
2.13.07 | Complete WUFI Modeling |
2.06.07 | Start Energy Plus energy modeling with Design Builder front end |
01.19.07 | Consultation with faculty advisor about final proposal changes |
01.19.07 | Proposal Addendum 1 Published |
12.18.06 | Building Statistics Part 2 Completed and Posted |
12.18.06 | Thesis Proposal Revised and Re-posted |
12.16.06 | Thesis Proposal Posted |
12.08.06 - 12.15.06 | Proposal Research and Considerations |
12.07.06 | Consultation with faculty advisor about proposal topics |
11.21.06 | Tech Report 3 Posted: Mechanical Systems | Existing Conditions Analysis |
11.01.06 | Tech Report 2 Posted, Final: Building and Plant Energy Analysis |
10.30.06 | Recieved Mechanical Cost Breakdown from Jerry at Whitby, Inc |
10.27.06 | Tech Report 2, 25% Submission Posted |
10.27.06 | Contact with Whitby, Inc. (Mechanical Contractor) |
10.16.06 | Contact with Carl Shilling, Burt Hill's Mechanical Engineer |
10.6.06 | Operations and Maintenance tour of Eberly Campus Community Center with Paul Mileko |
10.6.06 | Informational visit with Mucci Construction |
10.5.06 | Tech Assignment 1 Posted |
9.23.06 | Started Tech Assignment 1 |
9.22.06 | Student Bio Sketch Posted |
9.18.06 | Consultation with Bruce Rohrbach, Penn State Project Manager |
9.10.06 | Thesis webpage up and running |
9.5.06 | Consultation with faculty advisor about building selection and possibilities |
9.1.06 | Started 5th year course work |
Faculty Advisor: Dr. Jelena Srebric
Penn State Construction Managment contact: Bruce Rohrbach
Burt Hill contacts: Vince Fazzoni (Architect), Carl Shilling (Mechanical Engineer)
Mucci Construction contact: Kirsten Mucci
Penn State Fayette Campus contacts: Paula Congelio, Paul Mileko
Whitby, Inc. contact: Jerry (Mechanical Contractor)