“Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Hamad Alrahmani. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.”
Technical Assignments
Technical Assignment 1:
Technical report 1 is intended to summarize the existing conditions of the Murur Mixed-use Complex project. The report includes a summarized project schedule, a summary of the major building systems, a project cost evaluation and other construction management topics that will help in familiarizing the project.
Technical report 2 is a more detailed report including a detailed project schedule, and estimate of the structural system and the general conditions, and a more detailed site plan than the one used in Assignment 1. PACE roundtabkle meeting is also discussed in the critical industry issues section.
Technical report 3 has the main points discussed in a meeting with the Murur Mixed-use Complex planning engineer. The topics were, constructability challenges, schedule acceleration and value engineering. My own observations of the features of the project are in the last section of the report