JOHNS HOPKINS UNIVERSITY

CHARLES COMMONS

Progress Log

Date Assignment Status
5/12/06 Graduation  
4/17/06 Thesis Poster  
4/10/06 Presentation @ 3:20  
3/28/06 Final Summary Book complete
3/28/06 Breadth Analysis II Report complete
3/28/06 Breadth Consultation Summary complete
3/28/06 CM & Breadth I Report complete
1/28/06

Project Delivery Survey

Adobe Acrobat (PDF) file

Microsoft Word (DOC) file

 
complete
1/16/06 Progress schedules posted below updated
12/8/05 Thesis Proposal Revised 2/9/06 revised
11/19/05 Technical Assignment #3 complete
11/9/05 Problem Identification complete
10/31/05 Technical Assignment #2 complete
10/4/05 Technical Assignment #1 and Existing Conditions complete
9/19/05 Building Statistics and Bioprofile complete

 

Consultation Log

 

Date Meeting Contact
1/10/06 CM Depth Check-up Dr. Horman
1/13/06 DBOM/BOT Interview Pete Dahl
2/1/06 Interview w/ Owner Representative Mike DiProspero
2/8/06 Structural & Mechanical Breadth Check-up Dr. Parfitt
2/24/06 JHUCC Site Visit Ally Diaz
3/1/06 Structural Breadth Questions Dr. Parfitt
3/5/06 JHUCC Site Visit Ally Diaz
3/7/06 E-mail questions Jon Szczeniak
3/13/06

Phone interview

John Whitlow
3/14/06 Mechanical Breadth Questions Dr. Ling

 

 

January Schedule Link

 

January Progress Analysis Link

 

February Schedule Link

 

Senior Thesis Schedule

 

Home

Bryan A. Quinn

Building Statistics

Thesis Abstract

Technical Assignments

Progress Log

Thesis Research

Thesis Proposal

Presentation

Final Report

Reflection