User Note:
Note: While great efforts have been taken to provide accurate
and complete information on the pages of CPEP, please be aware that the
information contained herewith is considered a work-in-progress for this
thesis project. Modifications and changes related to the original building
designs and construction methodologies for this senior thesis project are
solely the interpretation of Chris Shelow. Changes and discrepancies in
no way imply that the original design contained errors or was flawed. Differing
assumptions, code references, requirements, and methodologies have been
incorporated into this thesis project; therefore, investigation results
may vary from the original design.