Progress Log
This is an up-to-date list of activities that have been performed during the completion of Senior Thesis.
Date Activity
01/16/06 Proposal Revised & Submitted
01/17/06 Structural redesign begun. Loads determined
02/02/06 Used ADOSS to design Two-Way Flat slab system
02/06/06 Column Loads determined. Preliminary Columns designed
02/08/06 Punching shear check performed on columns and slab
02/20/06 Completed design of Spread Footings
02/24/06 Columns redesigned due to bearing capacity on spread footings
03/07/06 Reinforcing checked in initial slab design. Reinforcing Plan complete
03/10/06 Building weights ascertained. Seismic Loads calculated and checked VS Wind loads.
03/12/06 Developed cost estimate of building structure
03/13/06 Lighting redesign accomplished. Actual lighting design accomplished
03/14/06 Developed shcedule estimate of the erection of the structure
03/18/06 Various schematic drawings complete. Preliminary comparisons done
03/20/06 Report Began.
03/31/06 Report COMPLETE!!
04/01/06 Report proofread and reviewed
04/03/06 Report Posted on the Web
04/05/06 Presentation Started
04/10/06 Presentation FINISHED
04/11/06 SURVIVED PRESENTATION and QUESTIONS!!
05/01/06 Website Updated.....THESIS IS DONE!!!!!