Presentation Files
This thesis presentation was presented at 3:40pm on Wednesday,
April 12th, 2006 in 107 Engineering Unit B on the Penn State University
Park campus in front of faculty and friends.
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of Joseph Bednarz. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.