Welcome to LINDSEY's AE Senior Thesis e-Portfolio
Technical Assignments
Technical Assignment 1 is an analysis of the existing lighting design. Design Criteria and calculations for each space are included in this assignment. Please see the Executive Summary for a short description of the report.
Technical Assignment 2 involves a detailed anaylsis of the building's power distribution. The report displays information about specific panelboards and distribution panels of the Harris Theater for Music and Dance.
The final technical assignment is a schematic design presentation for a new lighting design. There is an explanation of the building functions, features, and elements in this presentation. Design ideas and examples are also provided throughout the presentation for the four spaces chosen for redesign.
Following the presentation of technical assignment 3, I was given some suggestions and comments for improvement of the schematic design and criteria. To view those comments see the Lutron Comments file.