Ming Norman Tsui

Lighting/Electrical
Indianapolis International Airport - Midfield Terminal
Indiana, IN

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Ming Norman Tsui's AE Senior Thesis e-Portfolio

Progress Log

Date Announcement
04.03.06 Final Report Posted
03.06.06 2006 Portfolio Addtion Posted
01.29.06 Thesis Schedule posted
01.11.06 Thesis Proposal reposted (no revision req'd)
12.12.05 Thesis Proposal posted
12.06.05 Lutron Presentation
11.21.05 Technical Assignment 3 posted
11.10.05 Portfolio* posted
10.31.05 Technical Assignment 2 posted
10.30.05
10.30.05 Technical Assignment 1 updated
10.24.05 Website Updated
10.05.05 Technical Assignment 1 posted
9.15.05 Lighting Proposal posted
8.30.05 Started 5th year course work

Thesis Proposal Schedule (pdf)

Date Milestone
01.09 - 01.22 Finalize design choices
01.23 - 02.05 Finalize fixture selection, IES files, and ballast information
02.06 - 02.19 Intensive production session for illustration
02.20 - 02.28 Refine Renderings
03.01 - 03.03 Perform cost analysis for breadth work
03.04 - 03.12 Spring Break - Midpoint progress check
03.13 - 03.19 Perform LEED analysis
03.20 - 03.26
Create floor plans, electrical plans and control diagrams
03.27 - 04.05 Finalize Thesis Report

04.01 - 04.09

Prepare PowerPoint presentation
04.10.06 Final Thesis Presentation

 