Ming Norman Tsui

Lighting/Electrical
Indianapolis International Airport - Midfield Terminal
Indiana, IN

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Ming Norman Tsui's AE Senior Thesis e-Portfolio

Final Report

This final report is a culmination of all the studies I have conducted in the past 2 semesters for my senior thesis, and is a reflection of my knowledge gained throughout these 5 years of AE education and experience, applied and practiced on my selected building, The New Indianapolis International Airprot - Midfield Terminal.

Full Report

Cover Page
Abstract
Table of Contents
Executive Summary
Building Statistics
Background and Architecture
Overall Site Plan

Introduction to Lighting Depth

Exterior Departure
Ticket Hall
Civic Plaza
Passenger Concourse

Electrical Depth
Sustainable Design Breadth
Construction Management Breadth
Final Conclusions

References
Acknowledgements

Appendix A (Lamp & Ballast Schedule)
Appendix B (Daylight Study)
Appendix C (Custom Design Details)
Appendix D (Specification Sheets)

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Ming Norman Tsui |
This Page was last updated on April 8, 2006 , By Ming Norman Tsuiand is hosted by the AE Department ©2005