Final Report
![]() |
|
Abstract……………............................................................................................ |
Pg. 3 |
Acknowledgements & References……………...................................................... |
Pg. 3 |
|
|
Building Introduction…………………………………………………….......................... |
Pgs. 4-10 |
Background |
|
Client Information |
|
Project Delivery System |
|
Project Schedule & Sequencing |
|
Building Systems Summary |
|
Project Cost Summary |
|
Schedule Summary |
|
|
|
Executive Summary………………………………………………………......................... |
Pg. 11 |
|
|
Structural Breadth Study- Foundation Redesign………………………... |
Pgs. 12-27 |
Introduction |
|
Existing Conditions |
|
Problem Statement |
|
Research |
|
Proposal |
|
Structural Analysis |
|
Existing Micropile Plan |
|
Proposed Geopier Plan |
|
Constructability Analysis |
|
Schedule Analysis |
|
Value Engineering Analysis |
|
Recommendation |
|
|
|
Electrical Breadth Study- High Voltage Distribution Redesign...................... |
Pgs. 28-39 |
Background |
|
Problem Statement |
|
Proposal |
|
Preliminary Analysis |
|
Existing Layout Synopsis |
|
Proposed Layout Synopsis |
|
Distribution Systems Loss Analysis |
|
Constructability Analysis |
|
Value Engineering Analysis |
|
Recommendation |
|
|
|
Depth Study- Industry Influences on Subcontractor Markups................ |
Pgs. 40-57 |
Background |
|
Problem Statement |
|
Research Plan & Methodology |
|
CM/GC Survey Analysis |
|
Subcontractor Survey Analysis |
|
Comprehensive Response |
|
Building Respect |
|
|
|
Conclusion........................................................................................................ |
Pg. 58 |
|
|
Pgs. A.1-6 |
|
Pgs. B.1-5 |
|
Pgs. C.1-14 |