Chris Voros

Construction Management
Cancer Institute
Penn State Milton S. Hershey Medical Center- Hershey, PA

 

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

 

Proposal

This report details the planned research and analysis topics for the upcoming spring semester. The first item discussed is the critical industry issue of subcontractor bid markups. The research will assess the characteristics of CM and GC companies that cause these markups to vary so widely within the industry. Next, the report details three technical analyses to be performed on the Cancer Institute, with a focus on value engineering, constructability, and schedule reduction. At the conclusion of the research, the findings will be documented and presented before a jury for evaluation.

Executive Summary

Final Draft Proposal (PDF 281 kB)

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact Chris Voros |
This Page was last updated on December 20, 2006 , By Chris Voros and is hosted by the AE Department ©2005