Progress Log
Date |
Announcement |
4.26.07 |
Posted ABET Evaluation |
4.25.07 | PACE Presentation |
4.18.07 |
Posted Final Presentation |
4.18.07 | Updated Biosketch and Resume |
4.12.07 |
Posted Final Report |
3.09.07 |
Presentation Outline posted |
3.06.07 |
Subcontractor Online Survey posted |
2.07.07 | Updated Thesis Proposal and Progress Log |
12.20.06 |
Uploaded Thesis Proposal and Building Stats Part 2 |
11.21.06 |
Uploaded Tech 3 |
10.30.06 |
Uploaded Tech 2 |
10.18.06 |
Uploaded Abstract Poster |
10.05.06 |
Uploaded Tech 1 and Existing Condtions |
9.21.06 |
Updated Webpage and Bio-sketch |
9.17.06 |
Posted Part I of Building Statistics |
9.05.06 |
Started 5th- year course work |
Correspondence
October 6, 2006 - Visited PSHMC to tour early phasing of jobsite and collect additional project information.
October 8 - Discussion with PSU AE Grad Student to discuss ideas for research.
October 17 - Gathered critical information for the abstract poster, via email.
November 20 - Correspondence with Gilbane team at PSHMC to refine core tech 3 ideas.
December 3 - Conversation with Gilbane personnel to discuss thesis proposal ideas.
December 27 through January 12, 2007 - Revision process for surveys while working at CI jobsite.
February 5 and 6 - Phone correspondence with two ARM Group and CMT ( Geotechnical Engineers).
February 7 - Formal Meeting with CI foundation engineer at CMT.
February 8 - Meeting with AE Advisor to discuss proposal revisions and thesis progress.