Progress Log
Date | Announcement |
8.2.06 | Owner permission asked for |
8.30.06 | Owner permission granted |
9.14.06 | Verified plans/dwgs were on their way |
9.25.06 | Recieved first set of drawings |
10.6.06 | Technical Assignment 1 due |
10.12.06 | Attended Pace Roundtable Meeting |
10.20.06 | Interviewed with Davis Construction |
10.20.06 | Critical Issues Analysis due |
10.23.06 | Recieved second set of drawings |
10.30.06 | Technical Assignment 2 due |
11.10.06 | Problem Identification due |
11.10.06 | Interviewed with Whiting Turner |
11.14.06 | Attended Penn State AE Career Fair |
11.15.06 | Interviewed with HITT Construction |
11.21.06 | Technical Assignment 3 due |
12.4.06 | Thesis Proposal Presentation |
12.11.06 | Thesis Proposal due |
12.17.06 | CPEP page finalized for semester end |
1.19.07 | Started Spring semester coursework |
2.10.07 | Posted 1st Question on Disscussion Board |
2.10.07 | Set-up phone interiew with project Architect (Greer Hayden) |
2.15.07 | Posted Analysis 1 survey on CPEP |
4.12.07 | Final Report Due |
4.17.07 | Presentation Day |
5.2.07 | ABET Survey completed |
5.7.07 | CPEP SITE READY |