Progress Log

Date Announcement
8.2.06 Owner permission asked for
8.30.06 Owner permission granted
9.14.06 Verified plans/dwgs were on their way
9.25.06 Recieved first set of drawings
10.6.06 Technical Assignment 1 due
10.12.06 Attended Pace Roundtable Meeting
10.20.06 Interviewed with Davis Construction
10.20.06 Critical Issues Analysis due
10.23.06 Recieved second set of drawings
10.30.06 Technical Assignment 2 due
11.10.06 Problem Identification due
11.10.06 Interviewed with Whiting Turner
11.14.06 Attended Penn State AE Career Fair
11.15.06 Interviewed with HITT Construction
11.21.06 Technical Assignment 3 due
12.4.06 Thesis Proposal Presentation
12.11.06 Thesis Proposal due
12.17.06 CPEP page finalized for semester end
1.19.07 Started Spring semester coursework
2.10.07 Posted 1st Question on Disscussion Board
2.10.07 Set-up phone interiew with project Architect (Greer Hayden)
2.15.07 Posted Analysis 1 survey on CPEP
4.12.07 Final Report Due
4.17.07 Presentation Day
5.2.07 ABET Survey completed
5.7.07 CPEP SITE READY

 

 