Michelle Benoit

 

Structural Option
William W. Wilkins Professional Building
Columbus, Ohio

 
 
 
 
This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Michelle's AE Senior Thesis e-Portfolio

Progress Log

 

Date Announcement
4.16.07 Thesis presentation
4.12.07 Final Report submitted and posted
3.21.07 Meeting with Dr. Schneider to discuss foundation design
3.9.07 Posted Proposed Presentation Outline
3.5.07 Meeting With Dr. Memari to discuss moment connections and load distribution
1.31.07 Meeting with Dr. Lepage to discuss skip-joists
1.18.07 Updated Proposal posted
12.15.06 Buildnig Statistics part 2 and Proposal posted
12.6.06 Meeting with advisor to discuss proposal options
12.2.06 Began work on proposal
11.20.06 Posted Technical Assignment 3
10.26.06 Posted Technical Assignment 2

10.20.06

Posted Bio
10.10.06 Posted Abstract
10.5.06 Posted Technical Assignment 1
9.17.06 Building Statistics part 1 posted
9.12.06 Started working on CPEP site
9.5.06 Classes started
8.11.06 Owner permission slip faxed
7.13.06

Picked building

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on April 16, 2007 , By Michelle Benoit and is hosted by the AE Department ©2005