Progress Log
| Date | Announcement |
| 05.04.07 | CPEP Site complete! |
| 05.04.07 | ABET Reflection posted |
| 04.25.07 | Final Report and Presentation posted |
| 04.17.07 | DONE WITH THESES! TO PICKLE'S! |
| 04.17.07 | Presented at 11:40 am |
| 04.11.07 | Working on the final presentation |
04.08.07 |
Completed the Final Report!!! Out to Print! |
| 04.07.07 | Completed LEED and mechanical breadth |
| 04.06.07 | Completed construction breadth |
| 04.03.07 | Consulted Marc Bowen (Greenman-Pedersen, Inc.) regarding the sechedule for the original concrete structure |
| 03.31.07 | Consulted U.S. Department of Energy on efficient building insulating options |
| 03.29.07 | ALMOST DONE!!! Continuing with Final Report |
| 03.29.07 | Completed LEED Research |
| 03.26.07 | Finished steel structure schedule |
| 03.22.07 | Started LEED Research |
| 03.19.07 | Finished concrete structure estimate |
| 03.11.07 | Started concrete structure estimate |
| 03.09.07 | Started steel structure schedule |
| 03.09.07 | Finished final steel structure cost estimate |
| 03.08.07 | Posted proposed thesis presentation outline |
| 03.01.07 | Completed final gravity and frame design of the steel structure |
| 02.26.07 | Began steel structure cost estimate |
| 02.25.07 | Began modyfying structure in RAM to try to reduce steel costs |
| 02.23.07 | Began concrete structure cost estimate |
| 02.07.07 | Met with Dr. Memari to discuss designing the steel connections for the structural re-design |
| 02.06.07 | Posted question on discussion board |
| 02.02.07 | Finished modeling the steel structure in RAM |
| 01.23.07 | Proposal re-posted as approved by Dr. Memari |
| 12.15.06 | Proposal Posted |
| 12.05.06 | Researched LEED Certification for proposal |
| 11.20.06 | Technical Assignment 3 (Lateral System Analysis and Confirmation Design) |
| 11.07.06 | Started modeling the structure in ETABS |
| 11.04.06 | Began learning RAM Concept for Technical Assignment 3 |
| 11.01.06 | Consulted faculty about computer programs to analyze concrete shear walls |
| 10.28.06 | Visited The Towers in New York City! |
| 10.27.06 | Technical Assignment 2 (Pro/Con Structural Study of Alternate Floor Systems) posted |
| 10.20.06 | Researched staggered trusses for Technical Assignment 2 |
| 10.5.06 | Technical Assignment 1 (Structural Concepts and Existing Conditions Report) Posted |
| 10.2.06 | Resume Posted |
| 9.19.06 | Building Statistics posted |
| 8.30.05 | Started 5th year course work |