Kyle Macht

Construction Management
320 W. Beaver Ave.
State College, PA

Abstract

 

Project Overview Size 133,000 SF
-2 through 0 Below grade of parking
1 Commercial with parking in the back
2 through 7 Student Apartments
10 one bedroom apartments
55 two bedroom apartments.
Project Team  
Owner Blue Mountain Harmony, LLC
Contractor Poole Anderson Construction
Architect HAAS Building Solutions Inc.
Engineer Michael L. Norris & Associates Inc.
Overall Cost Contract Type Click on Picture for PDF Abstract
$15,000,000 Design - Bid - Build  
Start Date    
Excavation September 2006  
Foundation Started 1/07/2007  
Finish Date    
Substantial Completion 5/23/2008  

Architecture
320 W. Beaver Avenue was intended to be Nicholas Tower, but that building relocated, yet its influence on the design is evident. 320 W. has a glass store front, that is split by the entrance of apartments above, where the elevator and 1 of the two stairwells is located. A cladding of brick was used from the ground to second floor, then switches to an exterior insulation finishing system.

Mechanical Systems
Each apartment contains its own heat pump for heating and cooling, while the corridors have their own gas-fired furnace system. The mechanical room contains two combustion water heaters for domestic hot water.

Electrical and Lighting Systems

Main feeds enter the building and split into individual panels per apartment. Each apartment utilizes compact fluorescent lights while the rest of the building uses linear flourecent tubes.

Structural Systems
Cast-in-place concrete walls were used for the lower floors, which rest on thickened slab footings. The walls above the second floor are concrete masonry units. The parking garage uses pre-cast planks where the apartments utilize hollow core planks that span across those walls.

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | Contact STUDENT | Solar Decathlon
This Page was last updated on May 1, 2008 , Kyle Macht and is hosted by the AE Department ©2005